chore(license): Add LICENSE

3 jobs for master in 37 seconds (queued for 22 minutes and 53 seconds)
Status Job ID Name Coverage
  Test
passed #19406
code-analysis

00:00:18

passed #19407
lint-analysis

00:00:12

passed #19408
mccabe

00:00:07

 

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).

There are no tests to show.