chore(release): versión 8.0.2.5.1

3 jobs for feat_report_qr in 1 minute and 13 seconds (queued for 2 seconds)
latest
Status Job ID Name Coverage
  Test
passed #61765
code-analysis

00:00:35

passed #61766
lint-analysis

00:00:24

passed #61767
mccabe

00:00:14

 

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).

There are no tests to show.